TZ1600-35 2-Sides 2-Coatings Aluminium Production Line (Separated)

  Everything Else

TZ1600-35 2-Sides 2-Coatings Aluminium Production Line (Separated)


Coating line features:


Model TZ1600-35 coating line (separated structure) is suitable for certain coating factories. 2-sides 2-coating coating products in thickness range 0.15mm~0.6mm applies to most ACP material, roofing and ceiling material. Model TZ1600-35 coating line is high quality coating line, good performance in all kinds of paint coating. Separated structure is flexible in production, pretreatment process and coating process are separated and non-interfering, so that production is much easier to plan or schedule. Operation faults and equipment problems effect is less.


A primary reason to choose separated structure is its advantage over dimension, Model TZ1600-35 requires only 85m×18m×7m workshop.


Application: For coating aluminium coil of ACP(Aluminium Composite Panel), roofing , cladding, ceiling,roller shutter,etc.
Advantage: Widely usage range, short line, smaller dimension workshop needed,  less operation faults and equipment problems effect .


1. Main parameters of coating line


Material parameter










































Thickness:



0.150.6mm



Width:



1600mm



Outer diameter OD(max):



Φ1500mm



Inner diameter:



Φ405mm



Bobbin material:



Steel or paper



Inverval-layers deviation tolerance:



≤0.8 mm (Excluding the bottom 5 layers and exterior 2 layers)



Coil over-all deviation tolerance:



≤2 mm (Excluding the bottom 5 layers and exterior 2 layers)



Coating thickness:



Dry film thickness: 8~20 um


 



Product Weight:



Max 5000kgExcluding bobbin



 


CCL Processing Speed: 35 m/min (Speed benchmark: thickness 0.25mm coil exclude PVDF coating)


 


Heating Energy Source: LNG, LPG


 


Roller coating Process: Continuous 2 sides 2 coating & 2 baking


 


Properties and features:


















































Roller width:



1800mm



Coils feeding centering adjustment :



±75mm



Threading speed:



515m/minAdjustable



Line maximum speed:



35m/min



Line speed accuracy:



Steady Speed, ±0.1%; Acceleration, ±0.4%



Uncoiling tension range:



160800kgf



Processing tension range:



160800kgf



Coiling tension range:



3201400kgf



Tension accuracy:



Steady Speed, ±1.0%; Acceleration, ±2.0%



Line space dimensions:



76000mm×1000mm×6500mm



Heating Energy Source:



LNG, LPG



 


2. Basic Production Process


Coating line


Coil loading → Uncoil machine → Sewing table → Topside primer-paint roller-coater → Curing oven 1 → Air cooling → CPC 1 → Tension device 1 →Topside 2-coat and backside roller-coater → Curing oven 2 → CPC 2 → Tension device 2 → Coil machiner → Coil discharging


 


Pretreatment line


Coil loading → Uncoil machine → Sewing table → Acid washing, brushing roller → Water washing → Deionized water washing → Drying → Roller-coating chromizing → Drying → Cooling → Tension device → Coil machine → Coil discharging


 


Rewinding line


Coil loading → Uncoil machine → Sewing table → Tension device → Coil machine → Coil discharging


 


3. Main devices list


























































































Name



Quantity



Uncoil machine



3



Sewing table



3



Tension Device



4



Redirection steel roller



11



Brushing roller



2



Degrease pool



3



Water washing pool



2



Drying device



2



Squeeze roller



5



Roller-coating chromizing coater



1



Coater



2



Curing oven



2



Heat system



2



Air cooling system



4



Film device



1



Coil machine



3



CPC



2



EPC



3



Steel frame



1



Electrical system



3



*Optional configuration: waste gas treatment and energy recycle system


 


4. Water and power consumption of coating line






























Total power consumption:



600KW



Compressed air:



Min5.5bar,1Nm3/min,actual consumption



Water:



Deionized water, supply quantity is about 4T/h



Heating fuel:



LPG or LNG



LPG consumption:



0.6 CBM/min



LNG consumption:



1 CBM/min



5.The coating line design and manufacture leads 100 days, installation and testing leads 60 days.
6.Trade terms: FOB, CIF are available
7.Payment terms: T/T, D/P, LC are acceptable
8. Packing style: Wooden pallet
9. Transportation: by sea


 Published date:

April 16, 2024

 Region:

Alabama

 Views

5



Share by email Share on Facebook Share on Twitter Share on Google+ Share on LinkedIn Pin on Pinterest

Useful information

  • Avoid scams by acting locally or paying with PayPal
  • Never pay with Western Union, Moneygram or other anonymous payment services
  • Don't buy or sell outside of your country. Don't accept cashier cheques from outside your country
  • This site is never involved in any transaction, and does not handle payments, shipping, guarantee transactions, provide escrow services, or offer "buyer protection" or "seller certification"

 Company

 Tel.: +86 755 8233 2214

Contact publisher